Set up your first schedule

Learn how schedules work, create your first schedules and add products so they show in the right schedules automatically.

Written by Gail Esterhuyse

šŸ’”This article is for the new Schedules experience. If your project shows Legacy schedules in the sidebar, see Schedules vs legacy Schedules: what’s different.

How schedules work

In the new Schedules, every product in your project lives in All products. You add each product once. You can add it from All products or from inside a schedule, and either way it goes into All products.

A schedule is a saved view of All products. It shows only the products that match its filter. For example:

  • A Lighting schedule shows products with the Lighting category.

  • A Kitchen schedule shows products with the Kitchen location.

  • A Builder Supplied schedule shows products with the Builder Supplied label.

If a schedule has no filter, it shows all the products in your project.

You do not need to copy a product into each schedule. When you give a product a category, location or label, it shows in each schedule that matches.

šŸ’”One product, every schedule view. Each product exists only once, in All products. Your schedule views show that same product. They do not hold copies of it. If you edit a product in All products or in any schedule view, the change shows everywhere: in All products and in each schedule view that includes the product.

For example, you change the price of a pendant light in your Lighting schedule. The new price also shows in All products, your Kitchen schedule and your Builder Supplied schedule.

Where to find it: Open your project and select Schedules → All products. You no longer create schedules from Create file.

Don’t have a project yet? See Create your first project in Programa.


1. Decide which schedules you need

Create a schedule for each list that you need to work from or send. For example, a lighting schedule, a kitchen schedule or a list for your builder.

Each schedule has four settings:

Products to include

Choose which products show in the schedule.

  • Categories: One type of product, such as lighting or furniture.

  • Locations: One room or area, such as the Kitchen.

  • Labels: One trade or package, such as Builder Supplied.

  • All products: Every product in your project, in a different layout.

Grouping

Choose the section headings. For example, to show a Kitchen section and a Bathroom section, group by Location.

Display type

Choose how the schedule looks on screen: Classic, Sheet, Card or List. For example, use Card for finishes and furniture, and Sheet for specifications and pricing.

Visibility

Choose who in your studio can see the schedule: Private (only you) or Team.

For every option, and a starting set of schedules that many studios use, see How to set up your schedules and views.


2. Create your schedules

āš ļø Set the visibility to Team. New schedules are Private by default, which means only you can see them.

  1. Open your project.

  2. Select Schedules → All products.

  3. Select Create a schedule.

  4. Enter a name, such as ā€œLighting & Electricalā€

  5. Select the products to include: categories, locations, labels or all products.

  6. Select a grouping.

  7. Select a display type.

  8. Set the visibility to Team.

  9. Select Create.

Do these steps again for each schedule that you need. You can add more schedules at any time.

What you see in each schedule depends on the filter:

  • Schedules with a filter (a category, location or label) start empty. They fill as you add products with that category, location or label in step 3.

  • Schedules with All products show every product in your project straight away.

šŸ’”Tip: You can also create a schedule from a view you’ve already set up. In any schedule, change the filters or grouping, then select Save → Save as a new schedule. The new schedule copies the filters of the schedule you were in, so check them before you add products.


3. Add products in All products

We recommend that you add products in All products, instead of inside a schedule.

Here’s why:

  • You see every product. All products has no filter, so a new product never disappears from view. If you add a chair inside a Lighting schedule, the chair does not match the filter and it leaves that schedule.

  • You choose where each product goes. Inside a schedule, Programa gives the new product the group heading you added it under. For example, a product added under Lounge gets the Lounge location. In All products, you set the category, locations and labels yourself, so the product shows in every schedule that matches.

  • You avoid duplicates. Each product only needs to be added once, so there’s no reason to add it again in another schedule view. If you add the same product twice, you get two separate products, and a change to one does not update the other.

  1. Go to All products.

  2. Select Add product.

  3. Paste a supplier’s product URL, or select a category for a custom item.

  4. Open the product to complete its details (step 4).

Add from URL is the fastest way. Programa adds the product name, brand and image, and gives the product a category.

For every way to add products, including from inside a schedule, see How to add products to your schedules.


4. Complete the key details

Open the product and complete its details from top to bottom.

These three details decide which schedules show the product:

  1. Category: Make sure the category is correct. It puts the product in your category schedules, such as Lighting. It also sets which specification fields you see.

  2. Locations & quantities: Add each room or area that the product goes in. Then enter the quantity for each one. This puts the product in your room schedules, such as Kitchen. If a room is not in the list, type its name and select Add. To add or manage locations, see How to assign and manage locations.

  3. Labels: Add the labels that your studio uses, such as Builder Supplied, Designer Supplied, Tiler or Budget Review. This puts the product in your label schedules.

Then complete the rest:

  1. Specifications: Complete the fields that you need. You can leave the other fields empty. Empty fields do not show in shared schedules or exports.

  2. Supplier details: Add the supplier and the lead time.

  3. Financial: Add the price, trade discount, shipping and markup. See How to set product costs and client prices.

šŸ’”Tip: To give many products the same location or label at once, go to All products, tick the products and select Add locations or Labels from the bar that appears.

Example: You add a marble from its supplier URL. Programa gives it the category Natural stone. You add three locations: Kitchen (6 m²), Ensuite (3 m²) and Family Bathroom (4 m²).

The marble now shows in your Materials & Finishes schedule under the Kitchen, Ensuite and Family Bathroom headings, with the quantity for each room. It also shows in your Kitchen schedule. You do not need to add it to either schedule yourself.


5. Check your schedules

Open each schedule. Make sure that your products show under the correct headings.

If something doesn’t look right:

  • A product does not show in a schedule: Open the product. Make sure that it has the category, location or label that the schedule includes, and that it is not archived.

  • A schedule is empty: None of your products have the schedule’s category, location or label yet. Give them the correct details (step 4).

  • Products show under ā€œUnassignedā€: The schedule is grouped by location or label, and these products don’t have one yet. Tick Unassigned to select them all, then select Locations or Labels.

For more fixes, see the troubleshooting section in How to set up your schedules and views.

šŸ’”Changing a schedule’s layout? Product details save straight away and update in each schedule view. Layout changes (filters, grouping, display type) only save when you save them, and they only affect that schedule view.

An orange dot next to the schedule name means you have unsaved changes.

To save your layout changes:

  1. Select Save in the filter bar or the schedule’s header menu.

  2. Select Save changes to update this schedule, or Save as a new schedule… to keep this schedule as it is and create a new one.