Which version of Schedules am I using?
Open the project and check either of these:
Browser tab: a legacy project's tab says Legacy Project overview. A New Schedules project's tab says Project overview.
Left-hand menu: New Schedules projects show a Schedules heading with All products underneath. Legacy projects have no Schedules heading. Their schedules are in Project Files.
New Schedules rolled out on 31 October 2026. Every project created since then uses New Schedules. Projects created before then stay on legacy Schedules unless you move them.
Can I move an existing project to New Schedules?
Yes, but it doesn't happen automatically. Your existing projects stay on legacy Schedules until you choose to move them.
Open the project and go to Project Overview.
Select Try it now in the bar at the top. You can also find Try the new experience in the … menu at the top right.
Programa copies the project into a new, separate project. Your original project doesn't change and keeps working as it does now, including its purchase orders and invoices.
Which projects to move: Moving works best for projects you haven't shared with your client yet. If you've already shared a project, taken client approvals, or have purchase orders or invoices in progress, finish that project in legacy Schedules.
For step-by-step instructions, see Copy a legacy project into the new Schedules.
Can I start a new project in legacy Schedules?
No. All new projects use New Schedules. If you prefer the old table layout, use the Classic view: open Display options and select Classic.
Do I need to download or install anything?
No. New Schedules is an update within Programa, not a separate download or installation.
Why did you change Schedules?
To help your studio spend less time managing information and more time designing and delivering great projects.
In the old Schedules, the same product could appear in multiple schedules as separate copies. Every change meant updating each copy individually, creating unnecessary admin and more opportunities for mistakes.
New Schedules brings everything together. Specify a product once, then create different views for clients, suppliers, rooms or procurement, all using the same information. Make a change once and every view stays up to date. Less double-handling, fewer errors and a faster, more connected way to manage projects from specification to delivery.
We've also introduced some of the most-requested improvements from studios:
Manage products across rooms: Use one product in multiple locations, with quantities calculated for each.
Make changes faster: Edit products in a spreadsheet-style Sheet view, with powerful bulk editing tools.
Capture every detail: Record specifications tailored to each product category.
Keep track of changes: Use Revisions to clearly identify what's changed between rounds.
Share with confidence: Save Issues to keep an exact record of what you've shared with clients and collaborators.
For more information, see Set up your first schedule.
How should I prepare my team?
Start with the change that matters most: your schedules become different ways of viewing the same project products, rather than separate copies to maintain.
A practical first session is to choose a low-stakes project, look at the same products in a couple of layouts, make one change and see where it appears. Agree which project and saved views your team will use before moving a live workflow. You can keep current projects in legacy Schedules while the team gets familiar with the new one.
For more information, see our Demo on Demand.
Working in New Schedules
Why isn't shipping shown separately in my totals?
If shipping is set to be added to the client total, it's included in the total but isn't currently displayed as a separate line.
To see the full breakdown, open the product and go to the Financial tab, where you'll find the client price, shipping and tax listed separately.
If I change a product in one schedule, do I need to update it everywhere else?
Not when those schedules are views of the same product in the same project. They use the same underlying product record, so a change to that record appears wherever it is shown.
Separate product copies are still separate records. This does not synchronize products across different projects.
Can I keep working by room, supplier or trade?
Yes. Group and filter the project's products to suit the job, then save that setup as a schedule view. For example, you can keep a room view for reviewing selections and a supplier view for checking everything you need from one supplier, without creating another set of product records.
For more information, see How to set up your schedules and views.
Am I locked into the first layout I choose?
No. You can switch between the schedule-style Classic layout, List, Card and the editable Sheet. Changing the layout changes how you see the products, not the products themselves.
How do I use one product in several rooms?
Assign the product to multiple Locations and set the quantity needed in each. The product keeps one set of shared specifications, while the location quantities contribute to its total.
For example, use the same fitting in the kitchen and laundry without maintaining a separate specification for each room.
Are category-specific specifications included in PDFs?
Yes. Category-specific specifications are supported in schedule PDFs, not only in individual product spec sheets. Preview a sample PDF before issuing it so you know which details the recipient will see.
Why am I seeing duplicate document-code warnings across schedules?
Document-code checks now run across the project's products, rather than treating each old schedule as a separate set. Review the products sharing that code before changing it; the warning can reflect the wider project check rather than a new duplicate created by your team.