Why did you change Schedules?
To help your studio spend less time managing information and more time designing and delivering great projects.
In the old Schedules, the same product could appear in multiple schedules as separate copies. Every change meant updating each copy individually, creating unnecessary admin and more opportunities for mistakes.
New Schedules brings everything together. Specify a product once, then create different views for clients, suppliers, rooms or procurement, all using the same information. Make a change once and every view stays up to date.
Less double-handling, fewer errors and a faster, more connected way to manage projects from specification to delivery.
We've also introduced some of the most-requested improvements from studios:
Manage products across rooms: Use one product in multiple locations, with quantities calculated for each.
Make changes faster: Edit products in a spreadsheet-style Sheet view, with powerful bulk editing tools.
Capture every detail: Record specifications tailored to each product category.
Keep track of changes: Use Revisions to clearly identify what's changed between rounds.
Share with confidence: Save Issues to keep an exact record of what you've shared with clients and collaborators.
For more information, see: Set up your first Schedule
Getting your studio ready
Will my current projects automatically change to New Schedules?
No. Your existing projects stay on the current Schedules experience. Any newly created projects will default to the new experience. We're rolling out a migration tool to studios in stages, and it will be available to everyone in the next few weeks.
How should I prepare my team?
Start with the change that matters most: your schedules become different ways of viewing the same project products, rather than separate copies to maintain.
A practical first session is to choose a low-stakes project, look at the same products in a couple of layouts, make one change and see where it appears. Agree which project and saved views your team will use before moving a live workflow. You can keep current projects in the existing experience while the team gets familiar with the new one.
For more information, see our: Demo on Demand
Do I need to download or install anything?
No. New schedules is an update within Programa, not a separate download or installation. Once it is available to your studio, you can access it in the app and choose whether to migrate an existing project.
Which version of Schedules am I using?
Open the project and look at the left-hand menu.
New Schedules: you'll see a Schedules heading with All products underneath it.
Legacy Schedules: there's no Schedules heading. Your schedules are in Project Files.
Projects created on or after 31 October use New Schedules. Projects created before that use legacy Schedules until you move them across.
Will my current projects automatically change to New Schedules?
No. Your existing projects stay on legacy Schedules unless you choose to move them when we roll out our migration tool. Every new project you create uses New Schedules.
Can I start a new project in legacy Schedules?
No. All new projects use New Schedules. If you prefer the old table layout, use the Classic view: open Display options and select Classic.
Working in New schedules
Why isn't shipping shown separately in my totals?
If shipping is set to be added to the client total, it's included in the total but isn't currently displayed as a separate line.
To see the full breakdown, open the product and go to the Financial tab, where you'll find the client price, shipping and tax listed separately.
If I change a product in one schedule, do I need to update it everywhere else?
Not when those schedules are views of the same product in the same project. They use the same underlying product record, so a change to that record appears wherever it is shown.
Separate product copies are still separate records. This does not synchronise products across different projects.
Can I keep working by room, supplier or trade?
Yes. Group and filter the project’s products to suit the job, then save that setup as a view. For example, you can keep a room view for reviewing selections and a supplier view for checking everything you need from one supplier, without creating another set of product records.
For more information, see
Am I locked into the first layout I choose?
No. You can switch between the schedule-style Classic layout, List, Card and the editable Sheet. Changing the layout changes how you see the products, not the products themselves.
How do I use one product in several rooms?
Assign the product to multiple Locations and set the quantity needed in each. The product keeps one set of shared specifications, while the location quantities contribute to its total.
For example, use the same fitting in the kitchen and laundry without maintaining a separate specification for each room.
Are category-specific specifications included in PDFs?
Yes. Category-specific specifications are supported in schedule PDFs, not only in individual product spec sheets. Preview a sample PDF before issuing it so you know which details the recipient will see.
Why am I seeing duplicate document-code warnings across schedules?
Document-code checks now run across the project’s products, rather than treating each old schedule as a separate set. Review the products sharing that code before changing it; the warning can reflect the wider project check rather than a new duplicate created by your team.