Skip to main content

How to organize and structure your Schedule

Create sections to group products by room, category, or project phase. Learn how to move sections and navigate large Schedules efficiently.

Written by Cellina Meydam
Updated over a month ago

This guide shows you how to organize your Schedule so you can efficiently manage products and minimize manual data entry.

Organizing your Schedule

You can easily organize your schedule by creating dedicated sections and reordering them as needed.

Creating sections

You can create multiple sections (e.g. by product category or location) or a single section housing all of your scheduled products.

  1. Within your Schedule, click + New Section

  2. Type a section name into the field

  3. Press Enter

Navigating between sections

Once you've created multiple sections, use the navigation dropdown to jump between them without scrolling.

  1. Click the View section button next to your Schedule tabs

  2. Select the section you want to jump to

Moving sections

Reorder sections to match your preferred workflow or project requirements.

  1. Navigate to the section you want to move

  2. Hover over the right side of the section heading

  3. Click the Up Arrow or Down Arrow to move it up or down the page

Deleting sections

Warning: Deleting a section is permanent and cannot be undone. You will be prompted to confirm the deletion by typing the section name.

  1. Hover over the top right of the section you want to delete

  2. Click the three dot menu

  3. Select Delete Section

  4. Type the section name in the confirmation box

  5. Click Delete


Understanding Schedule structure

Programa's flexible scheduling system lets you organize products in a way that works for your workflow. While we recommend organizing by product category, you can also structure by room or create one master Schedule with subsections.

Recommended structure by product category:

We suggest organizing your Schedules into four key categories:

  • Materials & Finishes

  • Fittings & Fixtures

  • Lighting & Electrical

  • FF&E (Furniture, Fixtures & Equipment)

Each Schedule can be further subdivided into broad product categories.

For example:

  • Materials & Finishes: Floor Finishes, Wall Finishes, Cabinetry Finishes, etc.

  • Lighting: Wall Lights, Downlights, Track & Strip Lighting, Pendant Lights, GPOs & Light Switches, etc.

With Programa's smart scheduling, each product only needs to be added once, even if it’s used in multiple locations. Any updates can be applied to a single entry and then duplicated across other schedules if needed.

To indicate placement, use Doc-Codes (document codes) or the Product Details field.

Note: This is a guideline, not a rule. If a different structure works better for your workflow, Programa can accommodate your preferred approach.


Need more help with organizing and structuring schedules? Contact our support team via live chat for personalized assistance.​​

Did this answer your question?